  {"id":75931,"date":"2017-01-31T15:06:13","date_gmt":"2017-01-31T20:06:13","guid":{"rendered":"https:\/\/www.ucf.edu\/news\/?p=75931"},"modified":"2019-07-03T12:46:51","modified_gmt":"2019-07-03T16:46:51","slug":"construction-begin-main-campus-new-energy-plant","status":"publish","type":"post","link":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/","title":{"rendered":"Construction to Begin on Main Campus New Energy Plant"},"content":{"rendered":"<p>Construction is set to begin on a new facility that will provide more resources to help affordably operate the growing 麻豆原创 campus and serve as an educational tool for students.<\/p>\n<p>District Energy Plant IV, a water plant that will break ground Feb. 1 on the northeast side of campus, will produce both chilled and hot water to cool and dehumidify buildings on campus, including the under-construction Research 1 Building, formerly called the Interdisciplinary Research and Incubator building. The plant\u2019s energy-efficient materials combined with its overall life-cycle cost is estimated to save the university $121,000 annually in operation costs and resources.<\/p>\n<p>\u201cThis project has been developed over three years and in many phases to ensure we meet our current and future energy demands in the most efficient way possible,\u201d said Curtis Wade, director of 麻豆原创 Utilities &amp; Energy Services. \u201cOur goal always is to ensure that energy at 麻豆原创 remains as affordable and reliable as possible.\u201d<\/p>\n<p>Historical data of campus cooling and other energy demands were used by Utilities &amp; Energy Services and Facilities Planning and Construction to design this project.<\/p>\n<p>District Energy Plant IV will have the capacity to produce 8,000 tons of chilled water, but only 4,000 tons will be put in place in the first phase. One thousand tons of chilled water will be used by the Research 1 Building alone, and the remaining 3,000 tons will be added to the existing underground infrastructure that serves nearly 75 percent of main-campus buildings. Research 1 Building is a 100,000-square-foot, three-story building that will have a mix of research labs, conference rooms and offices when it opens later this year. At maximum capacity, District Energy Plant IV can support six additional buildings the size of the Research 1 Building.<\/p>\n<p>The $14 million District Energy Plant IV project also is designed to serve as an educational tool for students. Interior pipes will be color coded, rather than just a \u201csea of pipes,\u201d to better show the various water circuits involved in the plant\u2019s operation, Wade said. Plus, an electric dashboard will display in real time the plant\u2019s metrics, including efficiency, energy usage and dollar per ton being saved, to name a few. Plant tours will provide educational opportunities outside of the classroom for engineering disciplines.<\/p>\n<p>\u201cThe campus grounds and the building itself can be used as a teaching tool, where we can blend academics with operations,\u201d said Wade, who added that LEED certification, a high-performance green building rating system, will be pursued for the new plant. If granted, this will be 麻豆原创\u2019s first industrial LEED certified facility on campus.<\/p>\n<p>RLF Architects is the architect and engineer of record for the project, Exp is the third-party commissioning agent and LEED consultant, and Charles Perry Partners Inc. is the construction manager. \u00a0The plant is expected to be complete in November.<\/p>\n","protected":false},"excerpt":{"rendered":"Construction is set to begin on a new facility that will provide more resources to help affordably operate the growing 麻豆原创 campus and serve as an educational tool for students. District Energy Plant IV, a water plant that will break ground Feb. 1 on the northeast side of campus, will produce both chilled and hot water to&hellip;","protected":false},"author":51,"featured_media":75918,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"template-twocol.php","format":"standard","meta":{"_acf_changed":false,"lazy_load_responsive_images_disabled":false,"footnotes":"","_links_to":"","_links_to_target":"","_wp_rev_ctl_limit":""},"categories":[5],"tags":[1068,2801,15761],"tu_author":[],"class_list":["post-75931","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-colleges","tag-construction","tag-leed","tag-pegasus-briefs"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Construction to Begin on Main Campus New Energy Plant<\/title>\n<meta name=\"description\" content=\"Construction is set to begin on a new facility that will provide more resources to help affordably operate the growing 麻豆原创\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction to Begin on Main Campus New Energy Plant\" \/>\n<meta property=\"og:description\" content=\"Construction is set to begin on a new facility that will provide more resources to help affordably operate the growing 麻豆原创\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"麻豆原创 News | 麻豆原创 Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/麻豆原创\" \/>\n<meta property=\"article:published_time\" content=\"2017-01-31T20:06:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-07-03T16:46:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/01\/District-Energy-Plant-IV-pic.png\" \/>\n\t<meta property=\"og:image:width\" content=\"538\" \/>\n\t<meta property=\"og:image:height\" content=\"355\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Rachel Williams \u201915\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@麻豆原创\" \/>\n<meta name=\"twitter:site\" content=\"@麻豆原创\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Rachel Williams \u201915\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/\"},\"author\":{\"name\":\"Rachel Williams \u201915\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/#\\\/schema\\\/person\\\/94c24ecc6774ac3319d1d69027b11220\"},\"headline\":\"Construction to Begin on Main Campus New Energy Plant\",\"datePublished\":\"2017-01-31T20:06:13+00:00\",\"dateModified\":\"2019-07-03T16:46:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/\"},\"wordCount\":472,\"image\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ucf.edu\\\/wp-content\\\/blogs.dir\\\/20\\\/files\\\/2017\\\/01\\\/District-Energy-Plant-IV-pic.png\",\"keywords\":[\"construction\",\"LEED\",\"Pegasus Briefs\"],\"articleSection\":[\"Colleges &amp; Campus\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2017\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/\",\"url\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/\",\"name\":\"Construction to Begin on Main Campus New Energy Plant\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ucf.edu\\\/wp-content\\\/blogs.dir\\\/20\\\/files\\\/2017\\\/01\\\/District-Energy-Plant-IV-pic.png\",\"datePublished\":\"2017-01-31T20:06:13+00:00\",\"dateModified\":\"2019-07-03T16:46:51+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/#\\\/schema\\\/person\\\/94c24ecc6774ac3319d1d69027b11220\"},\"description\":\"Construction is set to begin on a new facility that will provide more resources to help affordably operate the growing 麻豆原创\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.ucf.edu\\\/wp-content\\\/blogs.dir\\\/20\\\/files\\\/2017\\\/01\\\/District-Energy-Plant-IV-pic.png\",\"contentUrl\":\"https:\\\/\\\/www.ucf.edu\\\/wp-content\\\/blogs.dir\\\/20\\\/files\\\/2017\\\/01\\\/District-Energy-Plant-IV-pic.png\",\"width\":538,\"height\":355,\"caption\":\"Rendering of District Energy Plant IV\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction to Begin on Main Campus New Energy Plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/\",\"name\":\"麻豆原创 News | 麻豆原创 Today\",\"description\":\"Central Florida Research, Arts, Technology, Student Life and College News, Stories and More\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/#\\\/schema\\\/person\\\/94c24ecc6774ac3319d1d69027b11220\",\"name\":\"Rachel Williams \u201915\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89652486a958d3635f6a21a54e0e2e2851065c0fb3f933cdadf168a380c43cba?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89652486a958d3635f6a21a54e0e2e2851065c0fb3f933cdadf168a380c43cba?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89652486a958d3635f6a21a54e0e2e2851065c0fb3f933cdadf168a380c43cba?s=96&d=mm&r=g\",\"caption\":\"Rachel Williams \u201915\"},\"url\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/author\\\/ra717781\\\/\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/construction-begin-main-campus-new-energy-plant\\\/#local-main-organization-logo\",\"url\":\"\",\"contentUrl\":\"\",\"caption\":\"麻豆原创\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Construction to Begin on Main Campus New Energy Plant","description":"Construction is set to begin on a new facility that will provide more resources to help affordably operate the growing 麻豆原创","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/","og_locale":"en_US","og_type":"article","og_title":"Construction to Begin on Main Campus New Energy Plant","og_description":"Construction is set to begin on a new facility that will provide more resources to help affordably operate the growing 麻豆原创","og_url":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/","og_site_name":"麻豆原创 News | 麻豆原创 Today","article_publisher":"https:\/\/www.facebook.com\/麻豆原创","article_published_time":"2017-01-31T20:06:13+00:00","article_modified_time":"2019-07-03T16:46:51+00:00","og_image":[{"width":538,"height":355,"url":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/01\/District-Energy-Plant-IV-pic.png","type":"image\/png"}],"author":"Rachel Williams \u201915","twitter_card":"summary_large_image","twitter_creator":"@麻豆原创","twitter_site":"@麻豆原创","twitter_misc":{"Written by":"Rachel Williams \u201915","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/#article","isPartOf":{"@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/"},"author":{"name":"Rachel Williams \u201915","@id":"https:\/\/www.ucf.edu\/news\/#\/schema\/person\/94c24ecc6774ac3319d1d69027b11220"},"headline":"Construction to Begin on Main Campus New Energy Plant","datePublished":"2017-01-31T20:06:13+00:00","dateModified":"2019-07-03T16:46:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/"},"wordCount":472,"image":{"@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/01\/District-Energy-Plant-IV-pic.png","keywords":["construction","LEED","Pegasus Briefs"],"articleSection":["Colleges &amp; Campus"],"inLanguage":"en-US","copyrightYear":"2017","copyrightHolder":{"@id":"https:\/\/www.ucf.edu\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/","url":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/","name":"Construction to Begin on Main Campus New Energy Plant","isPartOf":{"@id":"https:\/\/www.ucf.edu\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/#primaryimage"},"image":{"@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/01\/District-Energy-Plant-IV-pic.png","datePublished":"2017-01-31T20:06:13+00:00","dateModified":"2019-07-03T16:46:51+00:00","author":{"@id":"https:\/\/www.ucf.edu\/news\/#\/schema\/person\/94c24ecc6774ac3319d1d69027b11220"},"description":"Construction is set to begin on a new facility that will provide more resources to help affordably operate the growing 麻豆原创","breadcrumb":{"@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/#primaryimage","url":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/01\/District-Energy-Plant-IV-pic.png","contentUrl":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/01\/District-Energy-Plant-IV-pic.png","width":538,"height":355,"caption":"Rendering of District Energy Plant IV"},{"@type":"BreadcrumbList","@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ucf.edu\/news\/"},{"@type":"ListItem","position":2,"name":"Construction to Begin on Main Campus New Energy Plant"}]},{"@type":"WebSite","@id":"https:\/\/www.ucf.edu\/news\/#website","url":"https:\/\/www.ucf.edu\/news\/","name":"麻豆原创 News | 麻豆原创 Today","description":"Central Florida Research, Arts, Technology, Student Life and College News, Stories and More","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ucf.edu\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.ucf.edu\/news\/#\/schema\/person\/94c24ecc6774ac3319d1d69027b11220","name":"Rachel Williams \u201915","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/89652486a958d3635f6a21a54e0e2e2851065c0fb3f933cdadf168a380c43cba?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/89652486a958d3635f6a21a54e0e2e2851065c0fb3f933cdadf168a380c43cba?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/89652486a958d3635f6a21a54e0e2e2851065c0fb3f933cdadf168a380c43cba?s=96&d=mm&r=g","caption":"Rachel Williams \u201915"},"url":"https:\/\/www.ucf.edu\/news\/author\/ra717781\/"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ucf.edu\/news\/construction-begin-main-campus-new-energy-plant\/#local-main-organization-logo","url":"","contentUrl":"","caption":"麻豆原创"}]}},"thumbnail":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/01\/District-Energy-Plant-IV-pic-300x198.png","primary_category":5,"primary_tag":1068,"author_byline":"Rachel Williams","acf":[],"_links":{"self":[{"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/posts\/75931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/users\/51"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/comments?post=75931"}],"version-history":[{"count":2,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/posts\/75931\/revisions"}],"predecessor-version":[{"id":75933,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/posts\/75931\/revisions\/75933"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/media\/75918"}],"wp:attachment":[{"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/media?parent=75931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/categories?post=75931"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/tags?post=75931"},{"taxonomy":"tu_author","embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/tu_author?post=75931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}