  {"id":79741,"date":"2018-04-23T14:00:14","date_gmt":"2018-04-23T18:00:14","guid":{"rendered":"https:\/\/www.ucf.edu\/news\/?p=79741"},"modified":"2018-07-05T15:40:56","modified_gmt":"2018-07-05T19:40:56","slug":"reflecting-pond-renovation","status":"publish","type":"post","link":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/","title":{"rendered":"Renovation of Reflecting Pond Nearly Finished"},"content":{"rendered":"<p>The most scenic feature on the 麻豆原创 campus \u2013 the Reflecting Pond \u2013 will be back in picture-perfect shape on May 1, just in time for graduation photo shoots.<\/p>\n<p>The Reflecting Pond was drained in October after Spirit Splash and has been undergoing an extensive renovation ever since. Work has progressed rapidly over the past several months as crews accelerated the project with the goal of finishing before Spring commencement ceremonies begin on May 3. It&#8217;s become a tradition for graduates to have their photos taken in front of &#8212; and sometimes in &#8212; the iconic Reflecting Pond.<\/p>\n<p>The pond has been hidden by a construction fence for several months, surrounded by heavy equipment and workers.<\/p>\n<p>Workers demolished and removed the entire concrete base of the Reflecting Pond, along with the fountain structure, lighting and more, before replacing plumbing and filtration, upgrading lighting to color-changing LEDs, adding more efficient fountain pumps and pouring a new concrete floor.<\/p>\n<p>The work was necessary because\u00a0the pond\u2019s aging underground pipes sprung several leaks last year, and heavy rains during Hurricane Irma caused runoff that damaged its electrical controls. The renovation corrected those problems and modernized the Reflecting Pond\u2019s technology and features.<\/p>\n<p>The engineering firm for the project was Sims Wilkerson Cartier Engineering, Inc., and the builder was Canaveral Construction. The renovation was overseen by 麻豆原创 Facilities Planning &amp; Construction and Utilities &amp; Energy Services.<\/p>\n<p>Over nearly a half-century, the iconic Reflecting Pond has been treasured by generations of Knights. It\u2019s been the backdrop for countless graduation photos, the centerpiece of Spirit Splash, and even hosted a U.S. president delivering a commencement address.<\/p>\n<p>Repairs have been made in the past, including a renovation in 2000 that replaced the pond\u2019s single small spout with three fountains.<\/p>\n<p>There was once a natural pond where the Reflecting Pond now sits. It was often dried up, but after a rain it would turn into a muddy pit several feet deep. 麻豆原创\u2019s first president, Charles Millican, solved the problem by turning the eyesore into the campus\u2019 prettiest feature.<\/p>\n<p>Construction of the Reflecting Pond was completed in 1970, around the same time Millican Hall opened. It measures 182 by 20 feet at its widest points, and holds 228,000 gallons.<\/p>\n<p>It has had auspicious moments over the years. In the university\u2019s early days, the water was drained and replaced with chairs for graduation ceremonies, and that\u2019s where students sat when President Richard Nixon delivered a commencement address in 1973.<\/p>\n<p>Spirit Splash started unofficially in 1995, when the president of the Student Government Association was pushed into the Reflecting Pond and cabinet members followed. The homecoming event was named \u201cBest Campus Tradition\u201d by the National Association for Campus Activities in 2011 and this year <a href=\"https:\/\/www.youtube.com\/watch?v=IT36qbYDnTQ\">ESPN&#8217;s Will Reeve took a nationally televised dip with our students<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pond Will Be Ready for Grad Photos May 1<\/p>\n","protected":false},"author":30,"featured_media":79746,"comment_status":"open","ping_status":"closed","sticky":false,"template":"template-twocol.php","format":"standard","meta":{"_acf_changed":false,"lazy_load_responsive_images_disabled":false,"footnotes":"","_links_to":"","_links_to_target":"","_wp_rev_ctl_limit":""},"categories":[5],"tags":[15761,3923],"tu_author":[],"class_list":["post-79741","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-colleges","tag-pegasus-briefs","tag-reflecting-pond"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.3 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Renovation of Reflecting Pond Nearly Finished | 麻豆原创 News<\/title>\n<meta name=\"description\" content=\"The Reflecting Pond was drained in October after Spirit Splash and has been undergoing an extensive renovation ever since. Work has progressed rapidly over the past several months as crews accelerated the project with the goal of finishing before Spring commencement ceremonies begin on May 3.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Renovation of Reflecting Pond Nearly Finished\" \/>\n<meta property=\"og:description\" content=\"The Reflecting Pond was drained in October after Spirit Splash and has been undergoing an extensive renovation ever since. Work has progressed rapidly over the past several months as crews accelerated the project with the goal of finishing before Spring commencement ceremonies begin on May 3.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/\" \/>\n<meta property=\"og:site_name\" content=\"麻豆原创 News | 麻豆原创 Today\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/麻豆原创\" \/>\n<meta property=\"article:published_time\" content=\"2018-04-23T18:00:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-07-05T19:40:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/11\/Millican-1-1200x763.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"763\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Mark Schlueb \u201993 &#039;21MA\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@麻豆原创\" \/>\n<meta name=\"twitter:site\" content=\"@麻豆原创\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mark Schlueb \u201993 &#039;21MA\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/\"},\"author\":{\"name\":\"Mark Schlueb \u201993 '21MA\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/#\\\/schema\\\/person\\\/c49b89acd64eb33d855225f922bd07a4\"},\"headline\":\"Renovation of Reflecting Pond Nearly Finished\",\"datePublished\":\"2018-04-23T18:00:14+00:00\",\"dateModified\":\"2018-07-05T19:40:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/\"},\"wordCount\":467,\"commentCount\":1,\"image\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ucf.edu\\\/wp-content\\\/blogs.dir\\\/20\\\/files\\\/2017\\\/11\\\/Millican-1.jpg\",\"keywords\":[\"Pegasus Briefs\",\"Reflecting Pond\"],\"articleSection\":[\"Colleges &amp; Campus\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2018\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/\",\"url\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/\",\"name\":\"Renovation of Reflecting Pond Nearly Finished | 麻豆原创 News\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ucf.edu\\\/wp-content\\\/blogs.dir\\\/20\\\/files\\\/2017\\\/11\\\/Millican-1.jpg\",\"datePublished\":\"2018-04-23T18:00:14+00:00\",\"dateModified\":\"2018-07-05T19:40:56+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/#\\\/schema\\\/person\\\/c49b89acd64eb33d855225f922bd07a4\"},\"description\":\"The Reflecting Pond was drained in October after Spirit Splash and has been undergoing an extensive renovation ever since. Work has progressed rapidly over the past several months as crews accelerated the project with the goal of finishing before Spring commencement ceremonies begin on May 3.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.ucf.edu\\\/wp-content\\\/blogs.dir\\\/20\\\/files\\\/2017\\\/11\\\/Millican-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ucf.edu\\\/wp-content\\\/blogs.dir\\\/20\\\/files\\\/2017\\\/11\\\/Millican-1.jpg\",\"width\":1600,\"height\":1017,\"caption\":\"麻豆原创 Reflecting Pond at sunset\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Renovation of Reflecting Pond Nearly Finished\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/\",\"name\":\"麻豆原创 News | 麻豆原创 Today\",\"description\":\"Central Florida Research, Arts, Technology, Student Life and College News, Stories and More\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/#\\\/schema\\\/person\\\/c49b89acd64eb33d855225f922bd07a4\",\"name\":\"Mark Schlueb \u201993 '21MA\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d4924778c237cb6a6ac852c094e147f12297b4d3a7384cd154cbb1214781a9da?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d4924778c237cb6a6ac852c094e147f12297b4d3a7384cd154cbb1214781a9da?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d4924778c237cb6a6ac852c094e147f12297b4d3a7384cd154cbb1214781a9da?s=96&d=mm&r=g\",\"caption\":\"Mark Schlueb \u201993 '21MA\"},\"url\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/author\\\/ma657918\\\/\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.ucf.edu\\\/news\\\/reflecting-pond-renovation\\\/#local-main-organization-logo\",\"url\":\"\",\"contentUrl\":\"\",\"caption\":\"麻豆原创\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Renovation of Reflecting Pond Nearly Finished | 麻豆原创 News","description":"The Reflecting Pond was drained in October after Spirit Splash and has been undergoing an extensive renovation ever since. Work has progressed rapidly over the past several months as crews accelerated the project with the goal of finishing before Spring commencement ceremonies begin on May 3.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/","og_locale":"en_US","og_type":"article","og_title":"Renovation of Reflecting Pond Nearly Finished","og_description":"The Reflecting Pond was drained in October after Spirit Splash and has been undergoing an extensive renovation ever since. Work has progressed rapidly over the past several months as crews accelerated the project with the goal of finishing before Spring commencement ceremonies begin on May 3.","og_url":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/","og_site_name":"麻豆原创 News | 麻豆原创 Today","article_publisher":"https:\/\/www.facebook.com\/麻豆原创","article_published_time":"2018-04-23T18:00:14+00:00","article_modified_time":"2018-07-05T19:40:56+00:00","og_image":[{"width":1200,"height":763,"url":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/11\/Millican-1-1200x763.jpg","type":"image\/jpeg"}],"author":"Mark Schlueb \u201993 '21MA","twitter_card":"summary_large_image","twitter_creator":"@麻豆原创","twitter_site":"@麻豆原创","twitter_misc":{"Written by":"Mark Schlueb \u201993 '21MA","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/#article","isPartOf":{"@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/"},"author":{"name":"Mark Schlueb \u201993 '21MA","@id":"https:\/\/www.ucf.edu\/news\/#\/schema\/person\/c49b89acd64eb33d855225f922bd07a4"},"headline":"Renovation of Reflecting Pond Nearly Finished","datePublished":"2018-04-23T18:00:14+00:00","dateModified":"2018-07-05T19:40:56+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/"},"wordCount":467,"commentCount":1,"image":{"@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/11\/Millican-1.jpg","keywords":["Pegasus Briefs","Reflecting Pond"],"articleSection":["Colleges &amp; Campus"],"inLanguage":"en-US","copyrightYear":"2018","copyrightHolder":{"@id":"https:\/\/www.ucf.edu\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/","url":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/","name":"Renovation of Reflecting Pond Nearly Finished | 麻豆原创 News","isPartOf":{"@id":"https:\/\/www.ucf.edu\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/#primaryimage"},"image":{"@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/11\/Millican-1.jpg","datePublished":"2018-04-23T18:00:14+00:00","dateModified":"2018-07-05T19:40:56+00:00","author":{"@id":"https:\/\/www.ucf.edu\/news\/#\/schema\/person\/c49b89acd64eb33d855225f922bd07a4"},"description":"The Reflecting Pond was drained in October after Spirit Splash and has been undergoing an extensive renovation ever since. Work has progressed rapidly over the past several months as crews accelerated the project with the goal of finishing before Spring commencement ceremonies begin on May 3.","breadcrumb":{"@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/#primaryimage","url":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/11\/Millican-1.jpg","contentUrl":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/11\/Millican-1.jpg","width":1600,"height":1017,"caption":"麻豆原创 Reflecting Pond at sunset"},{"@type":"BreadcrumbList","@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ucf.edu\/news\/"},{"@type":"ListItem","position":2,"name":"Renovation of Reflecting Pond Nearly Finished"}]},{"@type":"WebSite","@id":"https:\/\/www.ucf.edu\/news\/#website","url":"https:\/\/www.ucf.edu\/news\/","name":"麻豆原创 News | 麻豆原创 Today","description":"Central Florida Research, Arts, Technology, Student Life and College News, Stories and More","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ucf.edu\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.ucf.edu\/news\/#\/schema\/person\/c49b89acd64eb33d855225f922bd07a4","name":"Mark Schlueb \u201993 '21MA","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d4924778c237cb6a6ac852c094e147f12297b4d3a7384cd154cbb1214781a9da?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d4924778c237cb6a6ac852c094e147f12297b4d3a7384cd154cbb1214781a9da?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d4924778c237cb6a6ac852c094e147f12297b4d3a7384cd154cbb1214781a9da?s=96&d=mm&r=g","caption":"Mark Schlueb \u201993 '21MA"},"url":"https:\/\/www.ucf.edu\/news\/author\/ma657918\/"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ucf.edu\/news\/reflecting-pond-renovation\/#local-main-organization-logo","url":"","contentUrl":"","caption":"麻豆原创"}]}},"thumbnail":"https:\/\/www.ucf.edu\/wp-content\/blogs.dir\/20\/files\/2017\/11\/Millican-1-300x191.jpg","primary_category":5,"primary_tag":15761,"author_byline":"Mark Schlueb \u201993 '21MA","acf":[],"_links":{"self":[{"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/posts\/79741","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/users\/30"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/comments?post=79741"}],"version-history":[{"count":7,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/posts\/79741\/revisions"}],"predecessor-version":[{"id":88626,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/posts\/79741\/revisions\/88626"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/media\/79746"}],"wp:attachment":[{"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/media?parent=79741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/categories?post=79741"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/tags?post=79741"},{"taxonomy":"tu_author","embeddable":true,"href":"https:\/\/www.ucf.edu\/news\/wp-json\/wp\/v2\/tu_author?post=79741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}